The Leviton CDA01-L12 solid core current transformer (CT) is cost effective and less susceptible to damage during installation. Solid core CTs slip over power lines to measure the electrical current flowing through the line.
The Leviton CDA01-L12 solid core current transformer (CT) is cost effective and less susceptible to damage during installation. Solid core CTs slip over power lines to measure the electrical current flowing through the line.
Operating Ambient Temperature Rating | -30 to 55°C |
Relative humidity rating | ≤ 90% |
Maximum Rated Voltage | 600V |
Maximum Rated Current | |
100:0.1A CTs | Primary: 100A Secondary: 110mA (0.11A) |
200:0.1A CTs Primary: 200A Secondary: 110mA (0.11A) |
|
Pollution | Degree 2 Normally only non-conductive pollution occurs. Occasionally, however, a temporary conductivity caused by condensation must be expected. |
CTs | |
Size A | 0.72" (18.3mm) |
Size B | 2.06" (52.3mm) |
Size C | 0.82" (20.8mm) |
Size D | 48.00" (1219mm) |
Submetering How To Step 1 - Evaluate Facility
Submetering How To Step 2 - Energy Information Plan
Submetering How To Step 3 - Install
Submetering How To Step 1 - Evaluate Facility
Submetering How To Step 2 - Energy Information Plan
Submetering How To Step 3 - Install